Wright Brothers Pilot Facility (Featured Project)
Completion Date: January 2003

Wright Brothers Memorial Pavillion (Featured Project)
 

Outer Banks Visitors Center - Manteo, NC (Featured Project)
Completion Date: July 2002

Albemarle Adult Day Health Care Center - Edenton, NC
Completion Date: September 2001

Western Middle School - Robersonville, NC
Completion Date: September 2000
A new 75,000 sq ft middle school designed for 500 students with classrooms, kitchen, cafeteria, gym and lockers. Project components include structural steel frame, metal stud walls, brick veneer, standing seam metal roof, impact resistant drywall, acoustical ceiling, VCT, ceramic, carpet, laboratory casework, athletic equipment and kitchen equipment.

Chowan County Agriculture Center - Edenton, NC
Completion Date: September 2000
A new 15,270 sq ft agricultural research facility. Concrete footings, structural steel frame, brick veneer, shingle roof, pre-fabricated roof dormers, second floor mechanical mezzanine, metal stud walls, casework, drywall, carpet, VCT, acoustical ceilings, kitchen, sprinkler system and an entry bridge crossing wetland.

All Saints Episcopal Church - Southern Shores, NC
Completion Date: May 2000
A new 4,315 sq ft Episcopal Church. Contractor input to the building concept and throughout the design stage. Concrete foundation and slab, structural wood timber frame, shingle roof, second floor classrooms, hardwood floors, ceramic tile, sound system, organ, heat pump HVAC, gazebo and site work.

JK's Restaurant - Corolla, NC
Completion Date: June 1999
This new 3,494 sq ft restaurant was constructed on wood piling foundation and includes pre-fabricated wood truss structure, shingle roof, hardi-plank exterior, drywall over wood studded walls, hardwood and ceramic floors, built-in seating, full kitchen, walk-in cold storage units and a screened porch.

Pirate's Moor Townhomes - Kitty Hawk, NC
Completion Date: June 1999
This project includes the construction of six multi-unit townhome buildings and all related site work, roads, low pressure septic systems and landscaping. The forty-four units are wood frame structures on monolithic slab and footer foundations with vinyl and brick exteriors.
 

Camden Medical Park - Camden, NC
Completion Date: April 1998
Three medical office buildings with a total of 11,274 sq. ft. Brick exterior, metal stud framing, shingle roof. Offices include lead-lined X-ray facility, negative pressure exam rooms and "quiet therapy" rooms.

Albemarle Mental Health Center - Hertford, NC
Completion Date: November 1998
Construction of a new 3,450 sq ft office building. Project included concrete footer foundations, metal stud walls, shingles over wood tress roof and brick exterior.

Kern Pits Building - Blue Sky - Southern Shores, NC
Completion Date: May 1997
This unique building was designed and constructed to meet state of the art "Blue Sky" hurricane requirements. In coordination with Clemson University, FEMA and the architect, we shaped design plans and constructed this 3,500 sq ft building that includes wood, metal stud and concrete block construction.
     

Corolla Light Sports Center - Corolla, NC
Completion Date: April 1992
The largest sports facility on the Outer Banks, this building includes an 8 lane waveless competition pool, two indoor clay tennis courts, three indoor racquetball courts, an exercise room and administration offices. It is constructed on a concrete foundation and is a steel frame structure with block walls and cast-in-place concrete second floor slab.
     
HOME | WALDT BIO | KEY STAFF | RESIDENTIAL | YOUR HOME'S PROGRESS | SHOWCASE
COMMERCIAL | PORTFOLIO | FEATURED PROJECTS | CONTACT US
© 2003
SITE DESIGNED AND MAINTAINED BY gcp.com